Achievements

We have experience supporting a wide variety of production facilities, including piping, can manufacturing, mechanical equipment, air conditioning, and maintenance, mainly for pharmaceutical, chemical, food, and paper plant companies.
(Without honorifics/Unordered)

Piping Construction, Air Conditioning Equipment, Mechanical Equipment

Pharmaceutical, Medical Equipment, Food, Chemical Manufacturing Plants and Facilities

Without honorifics

Asahi Soft Drinks Mt. Fuji / Fuji-Yoshida Plant FUJIFILM Group Each Plant
Kirin Distillery International Toiletries
Ajinomoto Bakery Sekisui SoflanWiz
Morinaga Milk Industry Fuji Plant AGC SEIMI CHEMICAL
Nestlé Japan Asahi Kasei Corporation
Nippi Collagen Industry Fujinomiya / Shibakawa Plant Greencaps Pharmaceutical
J-OIL MILLS Shizuoka Plant Sunsho Pharmaceutical
Nihon Shokuhin Kako Fuji Plant RINREI WAX
Terumo Each plant Toyama Kankyou Seibi Ikeda Office (Bottling Business Department)
Kyowa Kirin Fuji Plant Pelnox
DAIICHI SANKYO CHEMICAL PHARMA Teijin Mishima Office
Otsuka Pharmaceutical Fukuroi Plant TSUMURA Shizuoka Plant
Nichi-Iko Pharmaceutical Fuji Plant
Chugai Pharmaceutical Fjieda Plant
UMN Pharma Akita Plant

Machinery, Industrial Product Manufacturers, Paper, Industrial Plants and Facilities

Without honorifics

Panasonic Himeji Plant PANAC INDUSTRIES
TOYOTA MOTOR Higashi Fuji Research Center Fuji Xerox Takematsu Office
Sharp Kameyama Plant Japan Display
Aoyama Steel Heat Processing Plant Omiya Paper
Shikoku Kakoki Fuji Oyama Plant TOMOEGAWA

Distribution, Public Facilities and Offices

Without honorifics

Shizuoka prefecture Fujinomiya City Office
Seiyu Plastic DAIGAKU SANGYO
Shizuoka Prefecture Civil Engineering Office Numazu Wharf

We also have many other achievements.
We can also handle factory construction in Japan and overseas, such as in Vietnam.
Please contact us for details.

Construction Technology

Sanitary piping for GMP (complete work procedures) Sanitary piping for HACCEP (complete work procedures)
Sanitary piping for CGMP(FDA)(complete work procedures)  Clean PVC piping (complete work procedures)
Instrumentation piping construction Conductive piping construction
Hydraulic piping (OST) Hydraulic flushing
Air piping Air supply piping
High pressure tank production Stainless steel tank production
SGP piping, SGPW piping Weld threaded piping
Large-diameter PVC piping GRP piping
Stainless steel full back-wave piping Auto welding machine piping
Stainless steel BA piping (clean tube) High-pressure steam piping
Arc welding piping PVC welding piping and duct
FRP tank design and production FRP piping design and production
FRP Repair
Heavy machine setup work Pump replacement work/Pump centering
Large compressor installation Exposure machine setup work
Scaffold construction Civil Engineering
X-ray Color check
Noise measurement Soundproofing measurement
Environmental measurement Local exhaust system design and production
Air conditioner installation Airflow measurement
Cleanroom design and production Constant temperature and humidity room design and construction
Energy-saving equipment construction Dust measurement
Blow molding machine piping
High-pressure air piping design and construction Explosion vent design and production
High-pressure steam piping design and construction Mechanical design
Air conditioning design Positive pressure calculation
Cleanroom design Structural calculation
Hazardous materials firefighting application Confirmation application
Fire equipment application
On-site investigation
Explosion-proof construction Works for a cleanroom (class1000 or more)
Works for dry environment

The reason there are blanks is because we have technologies that will be filled in the future. Please look forward to it. If you have any new technologies you would like us to support, please feel free to contact us.